Skip to content

The plan at a glance

Phase What Who Outage?
P0 Freeze and export: leave 1 to 3 bots, take the data export after the 00:00 UTC reset Frank + Claude no
P1 Part A: prepare and harden the box Frank no
P2 Part B: install and tune PostgreSQL, roles, empty schema Frank no
P3 Part D: Cloudflare (tunnel, DNS, SSL, WAF, rate limit, Access) Frank no
P4 Part E: build and test the Node adapter (code) Claude Code, Frank reviews no
P5 Part F: install the hub, research service and cloudflared on the box Frank no
P6 Part G: import the exported data, verify counts Frank + Claude no
P7 Part H: cutover (new paste URL in loaders, bootstrap and tab script) Frank minutes, per bot
P8 Part I: validate with 1 to 3 bots for at least 24 hours Frank + Claude no
P9 Parts J and K: backups, restore drill, monitoring Frank no
P10 Part L: retire the Worker; mark this document done Frank no
P11 Part P: single sign-in for more products (parked; not part of the migration) Claude Code + Frank no
P12 Part Q: the next builds from the backlog (per-user control password, secrets page, /v1 API, docs site) Claude Code + Frank no

Order matters: P1 and P2 and P3 can be done while Claude Code builds P4. P5 needs P1 to P4. P7 needs P6.


← Previous: Words you will meet, and the values you will create · Guide index · Next: Part A. Prepare and harden the Lightsail box (Phase P1) →