Unified build plan (Phase 1B)

Version 1.1 · 25 Nov 2026 · written for Frank (Thankgod Ikari). Converted into the repository on 29 Nov 2026 from Drive doc 65; this folder is now the record and the Drive document is only a pointer. It combines the build list discussed on 24–25 Nov 2026, doc 63 (Dashboard Redesign Completion Build Plan) and doc 64 (Secure Architecture, the Lightsail State Mirror and 24/7 Reliability).

Status: Frank approved the build order and the per-user analysis page on 25 Nov 2026. As doc 64 requires, each stage is restated to Frank before it is built. Nothing here changes the risk design.

Update 29 Nov 2026. The migration items (S2 / B3, Q2, Q3 and the Lightsail bullets of section 12) have moved to the migration guide (the former doc 66: AWS Lightsail, Cloudflare Tunnel, PostgreSQL for everything). This plan keeps the features and fixes that are still pending. Section 15 lists the topics to discuss after the migration. The live task list is the backlog.

Page Sections
Rules and decisions 1 Standing rules, 2 Decisions of 24–25 Nov
Stages 1 and 2 3 Test bots (C1–C3), 4 Request limits (B2)
Stage 3: live-money reliability 5 (A1–A6, late-bet guard)
Stage 4: research 6, C4–C8: research mode, take-profit modal, research page, ranking, multiplier groups
Stage 4: user analysis 6, C9–C10: per-user analysis page, pattern switching
Track D and definition of done 7 Dashboard completion, 8 Definition of done
Track E: security 9 Security and 24/7 architecture
Conflicts and platform rules 10 Conflicts, 11 Platform rules
Stage 5, decisions and to discuss 12 Stage 5, 13 Deferred, 14 Decisions, 15 To discuss
Appendices A bcgame socket findings, B Where things are

This plan holds four kinds of content: what is already decided, the approved order, how the three sources fit together, and the questions still open.

Approved order (Frank, 25 Nov 2026):

  1. Stage 1 — Test bots. C1 batch preset, C2 the ten new Layer 2 patterns, C3 test-balance defaults. Frank: “finish this first”.
  2. Stage 2 — Request limits. B2 polling throttle. It lands before the batch preset is used at scale, because 25 test bots per platform per loader multiply requests.
  3. Stage 3 — Live-money reliability. A2 settlement by balance reconciliation, A3 always-on feed, A4 exact game id, A6 live counter. The open pull requests #138 and #168 are reworked here before Frank merges them.
  4. Stage 4 — Research and user value. C4 research mode, C5 take-profit modal, C6 owner research page, C7 ranking, C8 multiplier groups, C9 per-user analysis page, C10 pattern switching for users.
  5. Stage 5 — Monitoring and the move. B1 Feed page, B4 naming, A5 bcgame script-stop causes, then B3 the Lightsail move (doc 64 stage S2; now the migration guide).
  6. Track E — Security, alongside from Stage 1: the threat model, then doc 64 stages S1, S3, S4, S5 and S6.
  7. Track D — Dashboard completion (doc 63 phases 0–11), placed as Frank confirmed on 25 Nov (O1): phases 0–1 with Stage 1, phase 2 right after it, phases 3–7 after Stage 3, phases 8–11 last (page).

On 25 Nov Frank also said “If that works fine” to the alternative of putting A2–A4 before C. He then confirmed the order as listed, so the list above stands.

Precedence. This plan wins over docs 63 and 64 wherever they differ. Within it, Frank’s decisions of 24–25 Nov 2026 win over the earlier ideation in doc 64; each conflict is listed in section 10. Doc 63 stays in force in full, as Track D.


Backlog · Next: Rules and decisions →