Skip to content

Track D and definition of done

7. Track D — Dashboard completion (doc 63, carried over in full)

Section titled “7. Track D — Dashboard completion (doc 63, carried over in full)”

Doc 63’s decisions (its section 3) stay in force:

  • the strict platform split;
  • plain names with info cards;
  • “Not used by this bot” lines;
  • typed exact amounts with the live check;
  • the bcgame 50 USDT cap;
  • the two “after a take profit” settings at the top;
  • search and apply-to;
  • four translations as drafts;
  • no algorithm on customer screens;
  • removal of the old per-card Settings window;
  • loaders only.

Phases (full text in doc 63, unchanged):

Phase Content
0 Safety net: checklist of every control in the old Settings, Bulk and New bots windows with its Studio destination; non-loader bots read-only; a Studio test for a loader-hosted bot; decide studio/studio.js
1 Settings redesign inside the Studio (Settings Layout v2.2): catalog, three sections, categories, info cards, the live check, search, apply-to, “change now” controls
2 Remove the old per-card Settings window; retire Bulk and New bots once Phase 0 passes; rewrite the 13 tests
3 Shared dropdown
4 Main table: presets, adaptive columns, My views
5 Compare
6 Diagnostics cards (this is where B2’s request meter is seen)
7 Cards, Tiles, Details restyle and the phone pass
8 Studio gaps against the Claude Design canvas
9 Languages
10 Later stages: public site, roles, customer bot creation, sign-up, billing. This is where C9’s paid tier connects.
11 Rename the older short setting keys, with aliases

Recommended placement (decision O1):

  • Phases 0 and 1 with Stage 1. C1 lives in the Studio’s create flow, so the catalog and Studio work are needed at the same time.
  • Phase 2 right after Stage 1, so the old windows are gone before more features land in them.
  • Phases 3–7 after Stage 3. They are not money-critical.
  • Phases 8–11 last.

8. Definition of done (doc 63 section 7, applies to every UI item in this plan)

Section titled “8. Definition of done (doc 63 section 7, applies to every UI item in this plan)”
  • Built in the window Frank actually uses: a loader-hosted bot in the new design on the real dashboard page. A synthetic card does not count.
  • Screenshots of the real window next to the matching mockup, in light and dark, and at 390 px where the mockup shows a phone.
  • A “matches / differs” list against the mockup.
  • A “nothing lost” check: every control of the replaced screen exists in the new one.
  • Tests pass. The existing suite shows only failures that also fail before the change. The config audit and regression pass.
  • The change log says what is visible, where, and what is not.
  • Pull requests are verified open on GitHub before any claim. After merge, the deployed dashboard is checked.
  • Nothing is called “built” or “done” before items 1 to 3.

← Stage 4: user analysis · Plan index · Next: Track E: security →